Construction Begins

June 12, 2008 - Removing forms
Remove boards

June 9, 2008 - Pouring footings
Footings

June 4, 2008 - Forms have been built for the footings - waiting for the cement...

Forms 2  Forms 3  Forms 4

Now we wait until the rains stop and the ground dries before any more work can be done... 

May 28 - After the storms even our current library seemed to be surrounded by water...

Library Main Street  Library 

May 28 - Unfortunately no footing will be poured today due to HEAVY rains
      
Water filled trench  More Water  More Water  More & More Water

May 27 - Trenches for footings to be pour May 28
Trenches for footings  More trenches  More Trenches  South Trench    

Progress from May 5 - May 19 - Water & Sewer Lines
Digging  More digging  Lines

April 23, 2008 - BIG JOB

Thanks to Roy Hill, Nezperce Construction, his CAT & big truck and volunteers. They ALL made removal of the bricks from the existing building, trucking them out, removal of the existing concrete,trucking it off and cleaning everything up a great second day of getting the site ready....

 City Maintenance - Craig   Brick Wall Coming Down  Loading up   Removal of Concrete   loading concrete   Volunteers  Roy & CAT  

March 7, 2008 - The Beginning

Before construction can begin....  there has to be a bit of de-construction.  The tin siding from the existing building had to come down, along with the wooden structure that was put up to attach the siding to...

Brick wall Volunteers

These pictures show the siding off of the existing building we will be building next to, and a few of the busy volunteers that worked to get this part of the job done.