Construction

Street work in front of Library                       Site Sign       New Library 
Street work in front
of Library

Fireplace  Base trim & chair rail  KitchenetteStorage-Work Rm Cabinets  Walls, ceiling readied for painting  Walls, ceilings wallboarded  View from Circ Desk  Meeting Room  Walls, ceiling Kids' room wallboarded  Kids' Room insulated  Insulated walls  Meeting Room  Fireplace insert  Wires, cables & boxes  Fireplace framed     Ceiling vents, etc.  More "stuff" into the ceiling  Duct work waiting to be installed  Ready for work to begin inside  View of water pipes in storage/work room    Front door & book return  Doors  Removing snow & ice from inside 2-7-09  Siding, windows, trim 2-5-09  Siding going on 2-4-09  Building Wrapped 2-2-09  Windows installed 1-29-09  View from across the street  Another view  View from the inside  More trusses  Placing the trusses 3  Placing the trusses 2  Placing the trusses 1  Trusses  Snowy Library  inside walls  Sheeting  Studs 10 31 08 East Wall  10 29 Lumber Delivered  Flooring done  2nd half  Half flooring  Electrical boxes  Condiuts 2  Condiuts 1  Cinder Block Wall 2  Cinder Block wall 1  Cinder Block going up  Sewer line  Brick off  Siding Off shovels   Golden Sholvels 

Last updated: October 18, 2009 - 4:53pm by nezperce