Construction Begins
June 12, 2008 - Removing forms
![]()
June 9, 2008 - Pouring footings
![]()
June 4, 2008 - Forms have been built for the footings - waiting for the cement...
![]()
Now we wait until the rains stop and the ground dries before any more work can be done...
May 28 - After the storms even our current library seemed to be surrounded by water...
May 28 - Unfortunately no footing will be poured today due to HEAVY rains
![]()
May 27 - Trenches for footings to be pour May 28
Progress from May 5 - May 19 - Water & Sewer Lines
![]()
April 23, 2008 - BIG JOB
Thanks to Roy Hill, Nezperce Construction, his CAT & big truck and volunteers. They ALL made removal of the bricks from the existing building, trucking them out, removal of the existing concrete,trucking it off and cleaning everything up a great second day of getting the site ready....
March 7, 2008 - The Beginning
Before construction can begin.... there has to be a bit of de-construction. The tin siding from the existing building had to come down, along with the wooden structure that was put up to attach the siding to...
![]()
These pictures show the siding off of the existing building we will be building next to, and a few of the busy volunteers that worked to get this part of the job done.